📞 +91-7667918914 | ✉️ iarjset@gmail.com
International Advanced Research Journal in Science, Engineering and Technology
International Advanced Research Journal in Science, Engineering and Technology A Monthly Peer-Reviewed Multidisciplinary Journal
ISSN Online 2393-8021ISSN Print 2394-1588Since 2014
IARJSET aligns to the suggestive parameters by the latest University Grants Commission (UGC) for peer-reviewed journals, committed to promoting research excellence, ethical publishing practices, and a global scholarly impact.
← Back to VOLUME 2, ISSUE 7, JULY 2015

REDUCTION OF STANDARD COST OF BALL BEARING

Ghatge Gaurav Rajiv, Khairnar H. P.

👁 4 views📥 0 downloads
Share: 𝕏 f in

Abstract: A bearing manufacturing line is complete flow of rings from material to finish in form of one piece flow from one machine process to another sequentially placed one after another connected by conveying manufacturing lines. A production manufacturing line is "factory within the factory" with dedicated machines, assortment and people, forming a well-structured flow of products by the bottleneck operations. Management of bottleneck is very important as it determines the production capacity, production capacity determines the output and output determines income, the output influence the cost per product, the income and cost determine the result and result finally determines future.The lost minute in the bottleneck is a lost minute for the entire manufacturing line and for all future.Managing the bottleneck is the most important activity in the entire production manufacturing line.

Keywords: Cycle time, Standard cost, Bottleneck machine, hard turning.

How to Cite:

[1] Ghatge Gaurav Rajiv, Khairnar H. P., “REDUCTION OF STANDARD COST OF BALL BEARING,” International Advanced Research Journal in Science, Engineering and Technology (IARJSET), DOI: 10.17148/IARJSET.2015.2709

Creative Commons License This work is licensed under a Creative Commons Attribution 4.0 International License.